S Hillhurst Road: Road closure in effect on Friday, July 25 from about 9:30 PM to 10 PM between the RORC and View Ridge/Sunset Ridge entrances to allow for the Ridgefield Raptors to put on a drone light show after the game.
S 21st Place and S 4th Way: Single lane closures will be in effect Friday, July 11 - Saturday, August 30 on S 21st Place and S 4th Way to allow the contractors to pour curb and pave for the Ridgefield Heights subdivision.
Pioneer Street - Lane Shifts and Intermittent Flagging - July: Lane shifts and intermittent flagging with brief holds on Pioneer Street between Discovery Drive and 56th Place to allow the city's contractor to complete work in the center median. This work is part of the Pioneer Widening project.
- Thursday, July 24 and Friday, July 25 - Flagging with holds on westbound Pioneer Street near Discovery Drive to bring in trucks for base lift paving on Discovery Drive.
Pioneer Street Lane Shift - May 30 - mid-August: Secondary lanes of Pioneer Street between Discovery Drive and Royle Road will be closed 24/7 to allow the contractor to widen the road and complete improvements now until mid-August - one lane in either direction will remain open. The closure includes the eastbound right-turn only lane onto S 47th Ave (Discovery Ridge/Rosauers), the westbound left turn onto S 47th Ave and the westbound right lane entering the Royle and Pioneer roundabout. Headed westbound, left turns onto S 47th Ave (Discovery Ridge/Rosauers) will be prohibited. These changes will impact the lanes available at the Royle Road and Pioneer Street roundabout. Please slow down (25 mph work zone speed limit) and pay close attention to signage, cones, lane markings and flaggers.
Discovery Drive/Pioneer Canyon - CLOSED: Discovery Drive/Pioneer Canyon Drive is CLOSED between Pioneer Street and 53rd Place to allow the contractor to complete underground utilities, walls, lighting, roadway, curbs. fencing and sidewalk.
View the online Traffic Map